BUREAU OF BUILDING CODE COMPLIANCE
Do you need help calculating fees? Go to our
ePlans submission to use the interactive worksheet to determine amount,
and if you're not ready to submit, you have the option to cancel. Also, our first
three forms for building plan approval (page 3), plumbing plan approval (page 3)
and medical gas plan approval (page 1) have worksheets to assist you in calcluating
fees. Please contact us, if you have any questions.
BUILDING CODE COMPLIANCE INSPECTION
- Inspection Information for Structural, Electrical, Plumbing, Building
Services Piping, and Medical Gas
Inspections are scheduled through our centralized dispatch by calling 1-800-822-3208,
8:15am to 3:15pm, Monday through Friday, except Holidays. When calling this number
please have your permit number ready.
Building Code Compliance services structural, electrical, plumbing, building services,
and piping inspections. For Plan Review and other plan related information, please
go to the top of the page.
MEDICAL GAS / PLUMBING
- Backflow Advisory Board Meeting Dates
Division of Industrial Compliance and Labor
6606 Tussing Road
Reynoldsburg, OH 43068
Directions
|
Date
|
Location
|
Time
|
|
March 12, 2013 |
Conference Room 1 |
10:00 A.M. |
|
June 11, 2013 |
Conference Room 1 |
10:00 A.M. |
|
September 10, 2013 |
Conference Room 1 |
10:00 A.M. |
|
December 10, 2013 |
Conference Room 1 |
10:00 A.M. |
PLANS REVIEW CHECK LIST
- Required Information On The Application For Certificate Of Plan Approval
Design Professional's Registration Number
Type of Construction
Use Group
- Required Fees For A Building Permit.
Board of Building Standards
Electrical
Industrialized Unit
Plumbing
Sprinkler
Structural / Mechanical
- Required Submittals For A Building Permit (All items may not be necessary
for every project)
ADAAG
Automatic Fire Suppression System Plans - Hydraulic Calculations
Automatic Signaling System Plans - Shop Drawings
Building Cross Sections
Design Professional's Seals on the plans
Door / Room Finish Schedule
Electrical Lighting Plans - Egress Lighting And Exit Signs
Electrical Power Plans
Electrical Service Plan - Riser Diagram / Panel Schedule
Electrical Site Plan - Chapter 27 OBC / NEC
Elevations
Floor Plans
Foundation Plan
HVAC Plans - Chapter 28 OBC / Ohio Mechanical Code
Model Energy Code
Other Fire Protection System Plans
Plumbing Plans - Chapter 29 OBC / Ohio Plumbing Code
Roof Framing Plan
Section Details
Site Plan